Skip to main content

Bridgefarmer & Associates, Inc.

Celebrating 38 Years of Excellence Since 1976

Home
About Us
Our Work
News & Articles
Awards
Corporate Leadership
Careers
Contact Us
Loop 12 and State Highway 183 Interchange
Irving, Texas

 

  • Loop 12 and State Highway 183, located in Irving, Texas, is a $395 million project involving design for the intersection as well as frontage roads, other highways and DART LRT civil work.

 

  • Bridgefarmer is preparing all the construction documents for this multi-level interchange.

 

                                                   

Bridgefarmer is preparing construction documents for the Loop 12, State Highway 114/Loop 12 multi-level interchange and associated frontage roads, highways and Dallas Area Rapid Transit (DART) Light Rail Transit (LRT) civil work for this project. The project will involve reconstructing the existing Loop 12 and SH-114 to an eight-lane facility with reversible H.O.V. lane and civil work for the future DART light-rail transit in the State right-of-way. This project includes widening the Loop 12 bridge over the Elm Fork Trinity River and will conform with the future IH-635/IH-35E Interchange project by building a portion of the future direct connector ramps at the northern terminus of Loop 12. Also, this project will conform with the future SH-183/Loop 12 Interchange project by building the direct connector ramps between SH-114 and Loop 12.